For a design-led range, an almost-right colour is a wrong colour. We set the silicone colourway with you before tooling begins and hold it across production runs, so a slow feeder launched in spring still matches the bowls, mats and packaging on shelf in autumn. Multi-color one-shot molding keeps the palette part of the body rather than a surface treatment.
The program is factory-direct and made to order: tooling is opened for your design, the compound and colour are specified by you, and we keep no stock. That also means the ridge motif, the footprint and the finish can be tuned to sit alongside the rest of your feeding line rather than fighting it.
Food grade silicone gives a seamless, waterproof body that rinses clean and stays quiet on hard floors. A 3D drawing is welcome but never required — our in-house tooling team can develop the geometry from a sketch, a Pantone reference, a sample or a written brief, and share it for approval before tooling is committed. MOQ 500 pieces.
Lead time: artwork in 3–4 days; mold in 15–18 days; samples in 7–8 days.
Reviews
There are no reviews yet.